Source detail
Enedis 2025 electrification connection and commissioning results
Enedis · buyer-authored DSO operating release · evidence high
Canonical sourceSRC-CR77P9PEM5MCMS5NZ8JQJP5MNAObserved 2026-08-19T04:00:27Z
Density
n/a
Quality
n/a
Confidence
n/a
Signals using this source
- European DSOs report large observed digital-and-flexibility operating outcomes, including 498 MW additional Enexis capacity and 584,000 Enedis connection or commissioning operations, without disclosing matching software cost and counterfactual attribution.
SIG-47DCWFHHRAWNVE0FZ155SGSXW7