Industry Insight SystemInsight publication
Source detail

Power Potential (Transmission & Distribution Interface 2.0) project close down report

National Grid ESO / UK Power Networks · buyer-authored regulated innovation close-down report · evidence high

Canonical sourceSRC-9VDJK72G4NHTR5BXM68QF0CPWSObserved 2026-08-19T07:17:06.775Z
Density
n/a
Quality
n/a
Confidence
n/a

Signals using this source

  • The Power Potential DERMS trial was delayed, required a material change and extra funding, showed only one of five DER met the fast dynamic-service response target, and limited direct replication to 19 of 36 GB voltage zones.
    SIG-CG71MZP4YAK38XWF0T6QHVN2BD